Repair Bldg 90748, Hulbert Field – US Air Force

Polu Kai Services was awarded a contract for the complete interior demolition and renovation of approximately 6,300 square feet of existing Building 90748 to accommodate 23 SOWS operations and weapon system. The approximate 6,300 square feet will be divided roughly in half, with the southern half to be for secret/secure operational support. This area will include spaces for OPS Floor, Staneval, WXT, OIC, NCOIC, and Team Room. The northern half of the project will provide space for the Command Section, and will include the entrance Lobby, Men and Women’s restrooms, Janitor’s Closet, Break Room, Conference/Training Room, Reception, SEM, 1st Sgt, Commander, and DO. The existing mechanical room will remain. All new plumbing fixtures, mechanical (boiler, chiller, chilled water pumps, piping, air handler, ductwork) and electrical systems will be provided.

Exterior work includes saw-cutting existing concrete paving and providing new handicap-accessible ramps for ingress and egress to/from the building. New post supported canopy systems will be provided for the main building entrance and existing communications room.

New exterior wall openings will be cut to provide for new fixed aluminum window systems for the Commander and 1st Sgt offices. The existing exterior door opening in the new SEM Room will be partially infilled with exterior wall construction and a new fixed aluminum window system.

Hurlburt-3

Image Gallery

Image Gallery